Positive results of the inspection and audit

Please be advised that Base Group, on March 30, 2020, received positive confirmation of the inspection and audit PN-EN ISO 3834-2 and PN-EN ISO 1090-2 + A1: 2012.

Base Group meets the requirements for Factory Production Control based on the PN-EN 1090-1 standard and the quality of welding processes according to PN-EN ISO 3834-2

Udostępnij:

Facebook
Twitter
Pinterest
LinkedIn